The Ukrainian Armed Forces Struck A Bridge Over The Seversky Donets River And Three Russian Military Aircraft
- 18.11.2026, 15:29
One of them, an Il-76, sustained very extensive damage.
The Ukrainian military struck a bridge over the Seversky Donets River in the Luhansk region and damaged three Russian aircraft. One of them, an Il-76, sustained very significant damage.
This was reported by the General Staff of the Armed Forces of Ukraine.
According to the General Staff, one of the targets of the attack on November 17 and into the night of November 18 was the road bridge across the Seversky Donets River near Stanytsia Luhanska. Russian troops used this crossing to supply the front lines with ammunition, fuel, and equipment.
“After the Kerch Bridge incident, the Russians are having to get used to the fact that their bridges are now breaking more often than they can repair them,” the military noted.
In addition, that same night, the Ukrainian military struck an enemy unit’s repair base near Khomutovka in the Kursk region. At this facility, damaged Russian equipment was being repaired so it could later be returned to combat operations.
The Ukrainian Armed Forces struck three Russian aircraft
The General Staff also reported on the results of a strike on the 123rd Aircraft Repair Plant in the city of Staraya Russa in the Novgorod region. The attack took place on November 10, and damage to three military transport aircraft has now been confirmed.
One of them—an Il-76—sustained very significant damage. All three aircraft have been temporarily taken out of service.
The Russian army relies on military transport aircraft to deploy personnel, equipment, and ammunition. Therefore, damage to these aircraft limits the enemy’s ability to use them for these purposes.
Ukraine’s strikes on the Crimean Bridge
As a reminder, Ukraine is systematically attacking facilities used by Russia for military logistics. One of the key targets has been the Crimean Bridge—a crossing that the occupiers used to transport fuel, ammunition, equipment, and personnel to the peninsula and further south into Ukraine.
The latest operation against the bridge lasted two consecutive days. On the night of November 16, Ukrainian drones damaged the road surface in at least two places, and the 227-meter arch of the road section was noticeably deformed.
However, the very next night the Defense Forces launched a second combined strike using drones and missiles. This time, the arch and the span of the road section collapsed into the water, and the railway structure was also damaged.
Ukrainian President Volodymyr Zelenskyy confirmed that the strike was the final stage of a joint operation by the SBU and the General Staff, which had been in the works for several weeks. According to him, prior to the attack, the Ukrainian military had systematically weakened Russian air defenses, radars, and electronic warfare systems around the crossing.